Beginning on Monday at 7:00 a.m., Longwoods Road between Murray Road and Colonel Talbot Road will be closed to cyclists and motorists for 3-4 weeks. The closure is required to safely complete sewer and water-main renewal work.
One lane will be open on Saturdays and Sundays for westbound traffic only. Eastbound through-traffic should consider Kilbourne Road as an alternative route. Signed detour routes are posted.
Pedestrian access will be maintained on both sides of the construction zone. Cyclists and motorists can continue to move north- and southbound on Colonel Talbot Road.